Kathmandu: In Nepal, which has become the ground of ‘war’ between India and China, the Modi government has given a befitting reply to the nefarious conspiracy of the dragon. India has expedited the final location survey for the Raxaul-Kathmandu rail line. After this, the way to run the train till Kathmandu will be clear. At the same time, China has also come into action due to India’s action and has accelerated its move. China has now started a study to examine the feasibility of the Kerung-Kathmandu railway line. This speed in the move of the dragon has come after the Prachanda government supported by KP Oli came to power.
Meanwhile, experts say that through this billion-dollar railway line, China wants to trap Nepal in debt trap like Sri Lanka. This railway line is to be built through the middle of the Himalayas, which will be very expensive and technically very challenging. Not only this, after the construction of the railway line, it will cost crores of rupees to keep it running. China wants to build this railway line under the Belt and Road project, the full cost of which it wants to recover from Nepal. Meanwhile, the Government of Nepal wants China to give it financial assistance instead of loan. China does not seem ready for this.
Nepal Plane Crash: Yeti Airlines plane crashed in Pokhara because of this… The truth of Nepal plane crash came to the fore!
India has left China behind in terms of running trains
According to the report of the Kathmandu Post, running the train in Nepal has now become a bone of contention between India and China. Both countries do not want to let their influence in Nepal end. Last December, a 6-member team from China had reached for the survey of the railways. For the first time after Corona, the Chinese survey team had come to Nepal. Nepal’s Railway Ministry spokesman Aman said, “The Chinese team visited various sites of the proposed rail network and returned to China after conducting the survey on Tuesday.” Aman said that we can now say that the feasibility study for running the train has now progressed.
In this way, India has left China far behind in terms of running trains. Another railway official Rohit Kumar Bisural said that the Indian side has completed its fieldwork for the final location survey for running the train from Raxaul to Kathmandu in Bihar. From the Indian side, this entire project is being executed by the Konkan Railway. This company will give its report between April and May. Earlier in March 2016, when KP Oli, who danced at the behest of China, visited Beijing, both the countries had signed an agreement for the railways.
Nepal Plane Crash: First husband’s life, pilot wife died while flying the same plane after 16 years, couple’s ‘murderer’ Yeti Airlines
PressWire18 provides latest news, bollywood news, breaking news hollywood, top tech news, business standard news, indian economy news, world economy news, travel news, mumbai news, latest news mumbai loksabha election 2024, video viral news, delhi news, Only at Only at Presswire18.com
$3 billion spent on railway between China and Nepal
After this, India’s ears perked up and it proposed a plan to run a train between Raxaul and Kathmandu. After this, this railway line was signed in the year 2018 during the then PM KP Oli’s visit to India. India is providing financial assistance for this electric railway line. On the other hand, about $ 3 billion will be spent on building a railway line between China and Nepal. Nepali experts say that it will take 42 months for China to study this railway project. India started late but will complete its final location survey very soon. This railway line will be 141 km long.